A219 Butterwick, London, Hammersmith And Fulham |
28 September — 30 September Lane closure |
Delays likely due to Streetworks
Excavation "Day 1 Excavate Install Ducting - Day 2 Monopole Deployment Via Hiab / Appropriate Tm - Day 3 Reinstatement" at A219 |
Responsibility: T-Mobile (UK)Limited |
EToN status: Planned work about to start |
|
|
|
A219 Hammersmith Broadway, London, Hammersmith And Fulham |
28 September — 30 September Lane closure |
Delays likely due to Streetworks
11/085 Tel39768 - Tm Only For - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd6 Plus Feed To Existing Chamber (F/W 2m New Duct And Underkerb) 21.00-05.00, Eastbound C/W Swapping Lane 1 & 2 & 3 And F/W To Chamber (Ped Access Maintained) at A219 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
|
A219 Queen Caroline Street, London, Hammersmith And Fulham |
28 September — 30 September Lane closure |
Delays likely due to Streetworks
11/085 Tel39768 - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd6 Plus Feed To Existing Chamber (F/W 2m New Duct And Underkerb) 21.00-05.00, Westbound C/W Swapping Lane 1 & 2 & 3 And F/W To Chamber (Ped Access Maintained) at A219 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
|
A315/B408 Glenthorne Road, London, Hammersmith And Fulham |
28 September — 09 October Lane closure |
Delays likely due to Streetworks
Fulcrum To Lay New Gas Main Approx 12m Across Carriageway. Each Lane Closed Seperately To Maintain Road Space at A315/B408 |
Responsibility: Fulcrum Pipelines Limited |
EToN status: Planned work about to start |
|
|
|
A315 Beadon Road, London, Hammersmith And Fulham |
28 September — 30 September Lane closure |
Delays likely due to Streetworks
11/085 Tel39768 - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd1 Plus Feed To Existing Chamber (F/W 2m New Duct And Underkerb) 21.00-05.00, Eastbound C/W Swapping Lane 1 & 2 And F/W To Chamber (Ped Access Maintained) at A315 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
|
A315 King Street, London, Hammersmith And Fulham |
28 September — 30 September Lane closure |
Delays likely due to Streetworks
This Permit Is For Thames Water, Which Will Involve Carrying Out Work To Dig Out The Meter Pit And Install A New Meter, Works In The Footway at A315 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
B412 St Mark'S Road, London, Kensington And Chelsea |
28 September — 02 October Traffic control (multi-way signals) |
Delays likely due to Streetworks
Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 110917 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. at B412 |
Responsibility: UK Power Networks |
EToN status: Planned work about to start |
|
|
|
|
|
A4020 Uxbridge Road, London, Hammersmith And Fulham |
29 September — 30 September Some carriageway incursion |
Delays possible due to Streetworks
Customer Connection New Residential Supply. Clear Blocked Tee & Repair Blockages If Found, Footway Works Only at A4020 |
Responsibility: Virgin Media |
EToN status: Planned work about to start |
|
|
|
A402 Goldhawk Road, London, Hammersmith And Fulham |
28 September — 30 September Some carriageway incursion |
Delays possible due to Streetworks
Clear Blocked Duct In Footway To Connect New Client at A402 |
Responsibility: Virgin Media |
EToN status: Planned work about to start |
|
|
|
|
|
|
|
B408 Askew Road, London, Hammersmith And Fulham |
28 September — 30 September Some carriageway incursion |
Delays possible due to Streetworks
Digimage To Rectify Defect In Footway - Dmt 79825 at B408 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
B415 Elgin Crescent, London, Kensington And Chelsea |
28 September — 30 September Some carriageway incursion |
Delays possible due to Streetworks
External Water Meter Installation In Footway at B415 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
B415 Elgin Crescent, London, Kensington And Chelsea |
28 September — 30 September Some carriageway incursion |
Delays possible due to Streetworks
External Water Meter Installation In Footway at B415 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
B450 Ladbroke Grove, London, Kensington And Chelsea |
29 September — 05 October Some carriageway incursion |
Delays possible due to Streetworks
Alter And Relay Domestic Service 3.5m From Main In Carriageway at B450 |
Responsibility: National Grid Gas Plc |
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|